Pre-determined Motion Time System (PMTS) - It is the work measurement technique to build up time for manual work making use of pre-determined elemental motion times. The following are the few methods of PMTS.
(a) Method Time Measurement (MTM)
(b) Work Factor System (WFS)
(c) Basic Motion Time Study (BMTS)
(d) Motion Time Analysis (MTA)
(a) Method Time Measurement (MTM)
(b) Work Factor System (WFS)
(c) Basic Motion Time Study (BMTS)
(d) Motion Time Analysis (MTA)
No comments:
Post a Comment