The critical path method (CPM) was first used by Morgan R. Walker in 1957. It helps in ascertaining time schedules, makes better and detailed planning possible, encourages discipline and provides a standard method for communicating project plans schedules and to time and cost performance.
Popular Posts
- Brake power of IC Engine
- Efficiency of an IC Engine
- Highest Paying Mechanical Engineering Companies in the World
- Indicated power of an IC Engine
- Total Pressure and Centre of Pressure
- Hydraulic Coefficients
- Bench Work and Fitting
- Engineering Mechanics - Introduction
- Dual Combustion Cycle
- Tools Used in Mechanical Engineering
No comments:
Post a Comment